Maintenance work on the i-DE network will require power cuts in several streets of the capital and in 30 municipalities of the region. Residents will receive notice 24 hours in advance.
Iberdrola will carry out power supply cuts from November 16 to 22 in the city of Madrid and in another 30 municipalities of the Community, according to Gacetín Madrid. The works will affect lines, transformation centres, and substations of the network.
The distributor i-DE, part of the Iberdrola Group, states that these planned works are necessary:
They are essential to improve service quality and ensure the safety of the installations.
In the capital, numerous streets will experience cuts. The affected municipalities are Alcalá de Henares, Alcobendas, Alcorcón, Algete, Becerril de la Sierra, Boadilla del Monte, Cinco Villas, Colmenarejo, Fuenlabrada, Getafe, Guadarrama, Horcajo de la Sierra, Hoyo de Manzanares, Las Matas, Las Rozas de Madrid, Leganés, Majadahonda, Manzanares el Real, Moralzarzal, Móstoles, Navalcarnero, Parla, Pinto, Pozuelo de Alarcón, Puentes Viejas, San Fernando de Henares, Somosierra, Torrejón de Ardoz, Torrelodones, Tres Cantos, Valdemorillo, Valdemoro, and Villanueva de la Cañada.
Iberdrola will notify at least 24 hours in advance through posters in the affected buildings, indicating the expected start and end time of the cut. If the work finishes early, the supply will be restored immediately and without prior notice.
The company requests that, during the cut, no one manipulates the installation, as the service may return earlier than expected and there is a risk of serious accidents. If someone in the household relies on a medical device that requires electricity, the contract holder must call 900 171 171 or write to contacto@i-de.es to receive notice of the fault or the scheduled cut.





